Case study · CES · Las Vegas, NV · 2026

TCL at CES

A 120-foot ultra-wide LED banner over the entrance, a live-production stage, and a monolithic LED column, all playing as one continuous image.

TCL hanging LED wall at the CES booth inside the Las Vegas Convention Center
Case study
The brief

TCL comes back to CES every year, and the booth has to land 'Inspire Greatness' before anyone reads a word of copy. For 2026 that meant an entrance that registered from down the hall, plus a working stage inside it: somewhere a live demo could actually run rather than a screen playing a loop.

What we built

The centerpiece was a hanging ultra-wide P2.6 LED array over the entrance, 588 tiles across five separate walls, 14,208 by 1,728 pixels, about 121 feet end to end. A 36 by 9 tile centre wall carries the middle, with stepped side walls flanking it, and a one tile gap between each wall. Because the walls are discrete rather than one uniform grid, the array takes its shape without breaking the picture. You did not really look at it, you walked under it. We drove it from our media server on four synchronized 4K outputs, and although the wall was physically split into five sections (a center panel with two wings a side), the content read as one continuous image across the whole span. Inside, TCL's AiMe stage got the full live-production stack: speakers and mics, PTZ cameras, video switching and digital audio mixing, with every signal path built to stay up for the run of show. Its backdrop is a curved 45 tile P1.9 wall, 2,304 by 1,280 pixels and about 15 feet across, ground-supported and embedded into the booth structure so the frame never shows. Between the smart-kitchen and smart-laundry zones stood a tall, narrow LED column, 12 P1.9 tiles running 2 wide by 6 high, about 3 feet across and nearly 10 feet tall, angled into three faces, flat through the middle with the top and bottom kicked outward, which still played as one seamless picture despite the angles.

The result

The entrance did what a 120-foot canvas is supposed to do: it stopped people on the way in. The content was built for the shape rather than stretched to fit it, mixing sports clips, display-technology showcases and a forced-perspective particle sequence that gave the five sections real depth. The AiMe stage gave the booth a second anchor, so the space was not only spectacle. There was a live, human moment running on our gear all show.

The details

By the numbers.

  • 588 P2.6 tiles across five separate walls, not one continuous banner.
  • The centre wall alone is 36 by 9 tiles, about 59 feet wide and nearly 15 feet tall.
  • A one tile gap sits between each wall, so the array reads as one picture with deliberate breaks rather than a single unbroken screen.
  • Four synchronized 4K outputs from the media server drive the entire span.
  • The LED column between the smart-kitchen and smart-laundry zones is 2 tiles wide by 6 high, angled into three faces, and still reads seamless.
  • TLL has run the CES booth across five shows: 2020, 2023, 2024, 2025 and 2026.
On the floor

A look at the build.

Gear on this show

What we brought.

Flown LED wall hung from a straight truss in a convention center lobby, showing a golf course with palm trees

Hanging LED Walls

Part of this build.

View
Large LED video wall hung over a booth on a convention floor

LED Wall Install Crew

Part of this build.

View
LED back wall showing theme-park footage in the OCT Vision booth at IAAPA Expo 2022

Trade Shows

Part of this build.

View
A live switcher, playback laptops and a monitor on a tech table in a ballroom

Video Processing & Switching

Part of this build.

View
More work

Other projects.

LexJet at Printing United LED build
Printing United · Orlando, FL · 2025

LexJet at Printing United

Two LED rings rigged back-to-back, four flown cardinal walls, a floating sphere and an LED counter, all on one synchronized 360° canvas.

Case study
Whirlpool at KBIS LED build
KBIS · Orlando, FL · 2026

Whirlpool at KBIS

Five LED systems for four Whirlpool brands in one booth at KBIS 2026 - 437 tiles across three pixel pitches and three different ways of mounting them, plus audio, network and crew.

Case study
Bombardier at NBAA LED build
NBAA · 2026

Bombardier at NBAA

A U-shaped LED wall of flat and flexible tiles, built around one luxury seat so the picture wraps around the person sitting in it.

Case study
Taiwan Expo USA LED build
Taiwan Expo USA · Dallas, TX · 2025

Taiwan Expo USA

Main-stage LED wall, lighting, and crew for Taiwan Expo USA at the Kay Bailey Hutchison Convention Center in Dallas, August 14-16, 2025. We came back for the 2026 show.

Case study
Dominican Republic Tourism Showcase LED build
Tourism showcase · Miami, FL · 2025

Dominican Republic Tourism Showcase

An underwater LED environment in Miami: a 3D whale crossing a stage wall and five towers, with a round LED bar in the middle of it.

Case study
Hyundai Santa Fe World Premiere LED build
Hyundai Santa Fe · Santa Fe, NM · 2023

Hyundai Santa Fe World Premiere

Hyundai revealed the fifth-generation Santa Fe in the high desert outside Santa Fe, New Mexico. TLL surveyed the site, built three LED walls across an outdoor terrace and an indoor space, and ran lighting, audio and production live.

Case study
The LED Theatre LED build
IBIE · Las Vegas, NV · 2022

The LED Theatre

A seated room built out of four flown LED walls at IBIE 2022 - 356 tiles, a door cut through the screen, and twelve seats each on their own audio feed.

Case study
Ready?

Put us on your show.

Drop your show, your dates, and what you need. We'll send the quote.

Get a quote